To get a construction loan approved, show the lender four things: a 680+ credit score, completed builds (yours or your licensed GC's), cash for at least 10% of project cost plus reserves, and a full package: itemized budget, plans, and appraisal.
- Check the fitInvestment property, 1 to 4 units, $150K to $5M.
- Send the projectAddress, lot cost, budget, and completed value.
- Get termsWe reply with terms within one business day.
- Submit the packageEntity, bank statements, track record, plans.
- Appraisal and reviewWe order the appraisal and review the budget.
- CloseWeeks, not months, from a complete application.
Construction Loan Approval at Ledger: Quick Facts
- Minimum FICO
- 680 (700 for 90% LTC)
- Track record
- 5+ builds in 3 years
- No track record
- Qualify on your GC
- Loan size
- $150K to $5M
- Leverage
- Up to 90% LTC
- Completed value test
- 70% LTARV (75% at 10+ builds)
- Liquidity
- 10% of the loan or more
- Contingency
- 10% of the budget or more
- Tax returns
- Not required (standard loan)
- Time to close
- Weeks, not months
Have a project? Get terms before you apply.
Send the address, the lot cost, the budget, and the completed value. We size the loan on loan-to-cost and LTARV and reply with terms within one business day.
What a Lender Checks Before It Approves a Construction Loan
A construction lender approves two things: the borrower and the project. The borrower must show credit, experience, and cash. The project must show a real budget, approved plans, and a completed value that covers the loan. Here are the six checks, with the Ledger standard for each.
1. Credit
Ledger needs a 680 minimum FICO score from the guarantor. The 90% LTC program needs 700. We pull the credit report ourselves. A bankruptcy, a foreclosure in the last five years, or a felony conviction on a guarantor stops the loan at any score.
2. Track record
A lender wants proof that you finished similar projects. Ledger looks for five or more completed residential construction projects in the last three years. We verify each one with a settlement statement, or with a permit and a certificate of occupancy. Vacant lots, your own residence, and unfinished projects do not count.
With fewer than five, you can qualify on the record of a licensed general contractor with five or more completed similar projects in the last 36 months. The GC assigns the construction contract to Ledger and does not guarantee the loan. See the first-time builder construction loan.
3. Cash and liquidity
You need cash for your share of the project cost. At 90% loan-to-cost, your share is 10% of the total project cost. At 85%, it is 15%. Ledger also verifies liquidity of 10% of the loan amount or more on two months of bank statements.
- Checking, savings, and money market funds count in full.
- Brokerage and retirement accounts count at 60%. Your share of the cost must come from cash, not from these accounts.
- Gift funds, crypto, and equity in other real estate do not count.
4. The budget
The lender reviews the budget line by line. Ledger needs an itemized budget with a contingency of 10% or more. If a third-party general contractor builds the home, the budget carries the contractor fee: 5% of construction cost or more, or the fee in the signed GC contract. Line items must match current local costs for labor and materials. Include the permit and inspection fees.
5. Plans and permits
Approved plans are part of the package. You can close before the building permit is issued. The lot advance at closing is then capped at 60% of the lot value. If the permit is issued before closing, we can review a lot advance of up to 70%. No draw funds before the building permit is issued.
6. The completed value and the exit
The lender orders an appraisal that shows two numbers: the as-is value of the lot and the after-repair value (ARV) of the finished home. The loan must pass two tests. Loan-to-cost (LTC) caps the loan at a share of the total project cost. Loan-to-after-repair-value (LTARV) caps it at a share of the ARV. The lower result sets the loan. Our LTC vs LTV guide explains each ratio.
The exit must work too. If you plan to sell, the expected sale must show a profit, generally a gross profit of more than 10%. If you plan to rent, the expected rent must cover the payment on the long-term rental loan at a DSCR of 1.00x or more.
Ledger orders the appraisal from an approved vendor, and the report names Ledger as the lender. Ledger cannot accept an appraisal that the borrower ordered or that another lender transferred.
The Ledger Approval Box: Approved vs Declined
Each row is one requirement. A project that fits the middle column on every row qualifies for a term sheet.
| Requirement | Approved | Declined |
|---|---|---|
| Credit | 680 FICO or more. 700 or more for 90% LTC. | Under 680. A bankruptcy or a felony conviction. |
| Experience | 5+ completed builds in 3 years, or a licensed GC with 5+. | No completed builds and no qualified GC. |
| Cash | Your share of the cost in cash, plus liquidity of 10% of the loan or more. | Gift funds, crypto, or equity in other real estate as the source. |
| Property | Single-family homes, townhomes, and 2 to 4 units. Stick-built. | Condos, manufactured or modular homes, raw land with no construction plan. |
| Use | Investment property: build to sell or build to rent. | A home the borrower lives in. |
| Borrower | An LLC, LP, or corporation. US citizens and permanent residents. | Loans in a personal name. Foreign nationals. |
| Location | 45 states plus Washington, D.C. | MN, NV, ND, SD, VT, and rural locations. |
| Project status | New builds, and midstream builds with recent work. | A project with no work for 3 months or more. |
| Loan size | $150,000 to $5,000,000. | Under $150,000 or over $5,000,000. |
Documents You Need for a Construction Loan
About you and your company
- A loan application for each guarantor.
- A government-issued photo ID.
- Two months of bank statements for liquidity.
- A schedule of real estate owned, with the settlement statements for completed projects.
- Entity documents: operating agreement, articles of organization, EIN, and a certificate of good standing.
- Authorization for the credit report and the background check.
About the project
- The purchase contract, or the deed if you own the lot.
- An itemized construction budget with the contingency.
- The plans, and the building permit if it is issued.
- The GC contract and the GC license, if a third party builds.
- Builder's risk and general liability insurance, before closing.
- The appraisal. Ledger orders it.
Most delays come from a missing appraisal, incomplete plans, or an entity that is not formed yet. Send the package complete, and the loan can close in weeks, not months.
Step by Step: From First Call to Closing
- Check the fit. Confirm the project is an investment property with 1 to 4 units, in one of the 45 states plus DC that we lend in, with a loan between $150,000 and $5,000,000. See where we lend.
- Form the entity. The loan closes in an LLC, LP, or corporation. Form it before you apply. A new entity is fine.
- Send the project for terms. Send the address, the lot cost, the budget, and the expected completed value. We reply with terms within one business day.
- Sign the term sheet and submit the package. Send the documents above. We pull credit and run the background check.
- Appraisal and budget review. We order the appraisal and review the budget. If the ARV comes in low, the LTARV test lowers the loan, and more equity fills the gap.
- Approval and closing. Underwriting issues the approval, title and insurance clear, and the loan closes. At closing we fund the lot advance. The construction holdback waits for the first draw.
- Draws. You request a draw as work is completed. After the inspection, draws fund in 3 to 5 business days on average. See construction loan draws.
Worked Example: Approval at 85% and 90% LTC
A builder buys a lot for $150,000. The construction budget is $480,000, with the 10% contingency included. The total project cost is $630,000. The appraisal sets the after-repair value at $850,000. The builder has a 710 FICO score and seven completed homes in the last three years.
| Line | Standard (85% LTC) | 90% LTC program |
|---|---|---|
| Minimum FICO | 680 | 700 |
| Total project cost | $630,000 | $630,000 |
| LTC limit | $535,500 | $567,000 |
| LTARV limit (70% of $850,000) | $595,000 | Under $595,000 |
| Construction holdback, funded through draws | $480,000 | $480,000 |
| Lot advance at closing | $55,500 | $87,000 |
| Builder cash in the project | $94,500 | $63,000 |
| LTARV on the loan | 63.0% | 66.7% |
| Loan amount (the lower limit) | $535,500 | $567,000 |
The LTC test sets the loan in both columns, because the LTARV limit is higher. The lot advance in the 90% column is $87,000, or 58% of the lot value, under the 60% limit. The 90% column saves the builder $31,500 of cash. It needs a 700 FICO, a loan of $3,000,000 or less, and an LTARV under 70%.
When the appraisal comes in low. If the ARV comes in at $750,000, the LTARV limit falls to $525,000. In the standard column, the loan drops from $535,500 to $525,000, and the builder adds $10,500 of cash. In the 90% column, $567,000 on $750,000 is 75.6% LTARV, over the 70% cap, so the loan moves to the standard terms. The appraisal is the step that changes the most approvals.
What the example leaves out. Loan fees, closing costs, and interest are not in the table. Our construction loan calculator shows the carry on your numbers.
Why Construction Loans Get Declined, and the Fix
| Reason | The fix |
|---|---|
| Credit under 680 | Add a co-guarantor with a higher score. The co-guarantor owns part of the borrowing entity and signs the guaranty. |
| No track record | Hire a licensed GC with five or more completed similar projects in the last 36 months. |
| No contingency or no GC fee in the budget | Add a 10% contingency and the contractor fee before you submit. |
| The appraisal comes in under plan | Add equity, cut the scope, or change the plan. The LTARV cap does not move. |
| Cash from a source that does not count | Hold the funds in checking, savings, or money market accounts. Large new deposits need a written source. |
| No building permit at closing | Close at a lot advance of 60% of the lot value, or wait for the permit and request up to 70%. |
| The borrower plans to live in the home | Ledger cannot lend. Ask a bank about a construction-to-permanent loan. |
Bank vs Private Construction Loan Approval
| Point | Bank construction loan | Ledger (private construction lender) |
|---|---|---|
| Underwritten on | Your income, tax returns, and balance sheet. | The project, your track record, and your cash. |
| Tax returns | Two to three years, usually. | Not required on a standard loan. |
| Borrower | You, or your company with a full personal guarantee. | An LLC, LP, or corporation, with a guaranty. |
| Home you live in | Yes, with a construction-to-permanent loan. | No. Investment property only. |
| Your share of cost | Often 20% to 30%. | 10% to 15% of total project cost. |
| Time to close | Often 30 to 60 days or more. | Weeks. No loan committee. |
| Rate | Lower. | Higher. Private capital, priced on the project. |
Pick a bank if you build a home to live in, or if you have years of tax returns and time to wait. Pick a private lender if you build to sell or to rent, want more of the cost funded, or need to close in weeks.
How Ledger Approves Builders
- We underwrite the project and your track record. No tax returns on a standard loan.
- 680 minimum FICO. 700 opens the 90% LTC program.
- First-time builders qualify on a licensed GC with five or more completed similar projects in the last 36 months.
- Up to 90% LTC, $150,000 to $5,000,000 per loan, in 45 states plus Washington, D.C.
- Terms within one business day of receiving the project, and closings in weeks, not months.
- Draws in 3 to 5 business days on average, and no prepayment penalty.
The loans behind this are our ground-up construction loans, spec home financing for homes built to sell, and the build to rent loan for homes you hold. Running several homes at once? See the builder line of credit guide.
Frequently Asked Questions
How do I get a construction loan approved?
Show the lender four things. First, a credit score of 680 or more (700 for 90% loan-to-cost at Ledger). Second, a track record of completed builds, yours or your licensed general contractor's. Third, cash for at least 10% of the total project cost, plus verified liquidity. Fourth, a complete package: an itemized budget with a 10% contingency, approved plans, and an appraisal that supports the after-repair value.
What credit score do I need for a construction loan?
Ledger needs a 680 minimum FICO score on a construction loan. The 90% loan-to-cost program needs 700. A higher score does not offset a bankruptcy, a foreclosure in the last five years, or a felony conviction on a guarantor. Bank construction loans for a home you will live in follow different rules.
How much do I need to put down on a construction loan?
At Ledger, your share is 10% of the total project cost at 90% loan-to-cost, or 15% at 85%. The total project cost includes the lot, the construction budget, and the soft costs. You also pay the closing costs, and you show verified liquidity of 10% of the loan amount or more. A bank construction loan often needs 20% to 30% down.
Can I get a construction loan with no experience?
Yes, if your general contractor has the experience. Ledger qualifies a first-time builder on the record of a licensed GC with five or more completed similar projects in the last 36 months. The GC does not guarantee the loan. Leverage goes up to 90% of cost with a 700 FICO score.
What documents do I need for a construction loan?
For the borrower: a loan application for each guarantor, a photo ID, two months of bank statements, a schedule of real estate owned with settlement statements, and the entity documents. For the project: the purchase contract or deed, an itemized budget, the plans, the GC contract and license if a third party builds, and insurance before closing. Ledger orders the appraisal.
How long does construction loan approval take?
Ledger replies with terms within one business day of receiving the project details. After a complete application, a construction loan can close in weeks, not months. Most delays come from a missing appraisal, incomplete plans, or an entity that is not formed yet.
Why do construction loans get denied?
The common reasons are a credit score under the floor, no track record and no qualified general contractor, a budget without a contingency, an appraisal that does not support the loan, cash from sources that do not count, and an owner-occupied plan. Most of these have a fix before you apply. A felony conviction or a bankruptcy does not.
Do I need a building permit before the construction loan closes?
No. Ledger can close before the permit is issued, with the lot advance capped at 60% of the lot value. If the permit is issued before closing, we can review a lot advance of up to 70%. No construction draw funds until the building permit is issued.
Can I get a construction loan to build my own house?
Not from Ledger. Ledger makes business-purpose loans on investment property only: homes built to sell or to rent. To build a home you will live in, talk to a bank or credit union about a construction-to-permanent loan.
Who orders the appraisal on a construction loan?
The lender. Ledger orders the appraisal from an approved vendor, and the report names Ledger as the lender. It shows the as-is value and the after-repair value. Ledger cannot accept an appraisal that the borrower ordered or that another lender transferred.
Have a project ready for approval?
Send the address, the lot cost, the budget, and the completed value. We reply with terms within one business day. Or run the numbers first.
Estimate Your Rate Get a Term SheetRelated Reading
Related: First-Time Builder Construction Loans: no prior builds required when your GC has the experience.
Related: Spec Home Financing for Builders: construction loans for homes built to sell, up to 90% LTC.
Related: LTC vs LTV vs LTARV: how lenders size a construction loan, with worked examples.
Related: Construction Loan Draw Schedule: a sample $500K schedule by milestone and the draw process after closing.